Rapid Tooling Making

Fast-track Mold Solutions

Accelerate your product development with our rapid tooling solutions. We deliver high-quality molds in 2-3 weeks, perfect for prototypes and small production runs.

2-3 Weeks Delivery

Significantly faster than traditional tooling

Cost-effective Solutions

30-50% lower initial investment

Prototype to Production

Seamless transition capability

Design Flexibility

Easy modifications and iterations

Rapid Tooling Manufacturing

Accelerate Your Product Development

Our rapid tooling services bridge the gap between prototyping and mass production, offering quick-turn mold solutions without compromising on quality. Perfect for product validation, market testing, and early production runs.

Fast Turnaround

Complete mold manufacturing in 2-3 weeks, significantly faster than conventional tooling

Cost Efficiency

Optimized processes and material selection to reduce initial tooling investment

Design Flexibility

Easy modifications and iterations to perfect your product design

Bridge to Production

Seamless transition from prototype to low-volume production

Material Options

We offer various material options to balance cost, durability, and production requirements:

Aluminum (7075-T6)

  • Fastest production time
  • Excellent for prototypes
  • Up to 10,000 shots
  • Cost-effective solution

P20 Steel

  • Good balance of durability
  • Suitable for mid-volume
  • Up to 100,000 shots
  • Heat treatable

NAK80 Steel

  • High polish capability
  • Better wear resistance
  • Up to 500,000 shots
  • Premium surface finish

Ideal Applications

Rapid tooling is particularly suitable for:

Product Development

Validate designs and perform functional testing with production-intent materials

Market Testing

Produce small batches for market validation and customer feedback

Bridge Production

Fill production gaps while waiting for production tooling

Low Volume Production

Cost-effective solution for annual volumes under 10,000 units

Our Rapid Tooling Process

Streamlined process to ensure quick delivery without compromising quality:

Design Review & Optimization

Quick analysis of part design for moldability and rapid tooling suitability

1

Material Selection

Choose the most appropriate mold material based on requirements

2

Rapid CNC Machining

High-speed machining with optimized toolpaths

3

Assembly & Testing

Expedited assembly and preliminary testing

4

Sample Production

First article samples for approval

5

Rapid vs. Traditional Tooling

Understanding the differences to make the right choice:

Category
Rapid Tooling
Traditional Tooling
Lead Time
2-3 weeks
4-8 weeks
Initial Cost
30-50% lower
Higher investment
Durability
10,000-100,000 shots
1,000,000+ shots
Modifications
Easy & quick
Time-consuming

Common Questions

What is the typical lead time for rapid tooling?

Our rapid tooling services typically deliver complete molds within 2-3 weeks, depending on complexity and size.

How many parts can be produced with rapid tooling?

Depending on the material choice and design, our rapid tools can produce from 10,000 to 500,000 parts.

Is the part quality the same as with traditional tooling?

Yes, for most applications. While rapid tools may have slightly different cooling characteristics, they produce parts that meet quality requirements.

Can rapid tools be modified after production?

Yes, rapid tools are generally easier to modify than traditional steel tools, making them ideal for design iterations.

Ready to Accelerate Your Project?

Contact us today to discuss your rapid tooling requirements and get a quick quote.

© 2024 China Mold Expert | All rights reserved.